top of page
Runtime: 1m

Designs subject to change.
WAVE-ENABLED IN LESS THAN A DAY
1
.png)
CONSULT
We'll work with you to configure your system.



SETUP & TEST
Ready to go in
in a half a day.
TRAIN
Takes one to two hours.
Straightfoward & simple.
READY-TO-GO
Go live and experience safer swimming.
• Nothing goes in your pool except your swimmers
• No permits or licensed contractors required
• Drilling into walls not required.
• Battery-powered or plugged into AC
• Leave in place or take anywhere your swimmers go
2
3
1. Typical experience. Some deployments may take longer.
2. Contractors and permits may be required if your facility chooses to install new wall outlets.
3. Most components may be placed on existing, elevate flat surfaces such as shelves. Minimal drilling is required for wall-mounted equipment.
TOUR A WAVE DEPLOYMENT
System Diagram
準備好啟用 WAVE 並添加您的報價了嗎?
G
etting started with WAVE is simple. After a brief assessment of your needs, we'll help you configure the right system for your facility.
技術極大地提高了汽車工業、家庭安全和醫療保健的安全性。
我們相信是時候讓技術為水上運動做同樣的事情了。
如果您同意,那麼就成為 WAVE PARTNER 設施,並成為游泳者水上運動安全範式轉變的一部分。


Fill out this form to provide more details
about your facility and your specific needs.
bottom of page